April 2, 2008 Site Meeting

The block work progress continues on the Houndstooth. The block does not go up to the top of the building. Metal studs and drywall will go on top of the block wall to complete the walls up to the metal frame. You can see the final heighth of the of the block in the second picture below. Scott, with K&A, says that the project is still about two weeks behind due to the site work that had to be done in the beginning. He believes that this lost time should be picked up by May. The project should be back on schedule at that time. Roof joists will be in by the middle of April.

This is a picture of the bar area. You can see the center counter stand in the middle.

This is the left side of the front of the building. This door will open into the patio area.


This is the front of the building. You can see the main entrance in the middle.




The back side of the building is shown in this picture along with the fire hydrant that the fire department required us to put in for them.


This is a sample of the brick pattern selected for the outside of the building. You will notice the accent pattern on the top and bottom.