Thursday, May 8, 2008
May 7, 2008 Site Meeting
The major progress this week includes: electrical rough in, metal studs on exterior, mechanical rough in, roof framing, and exterior drywall. The major development is the power pole on the side street that had to be moved. The pole was determined to be too close to the building and roof over hang.
Roof frame work.
April 30, 2008 Site Meeting