Wednesday, March 26, 2008
March 26, 2008 Site Meeting
The Houndstooth building is coming along at a good pace. The nice weather has definitely been a positive.
The block work has begun at the back left corner of the building if you are looking at the Houndstooth from University Blvd.
Wednesday, March 12, 2008
March 12, 2008 Update
Houndstooth Update
The slab has now been poured. The contractor will be cutting the expansion joints in the slab over the next several days. The concrete that you see is basically what the finished floor will be and look like. It is a colored concrete, it will be very durable with little maintenance. The next steps will include laying the block for the walls and putting up the structural steel. The fourth picture below shows one of the building footings that the steel will be bolted to. This is what will support the structure and roof system of the building. Scott, with K&A, says that the project is still a couple of weeks behind due to the dirt work and weather. However, Scott is confident that these two weeks will be made up over the course of the project.

The slab has now been poured. The contractor will be cutting the expansion joints in the slab over the next several days. The concrete that you see is basically what the finished floor will be and look like. It is a colored concrete, it will be very durable with little maintenance. The next steps will include laying the block for the walls and putting up the structural steel. The fourth picture below shows one of the building footings that the steel will be bolted to. This is what will support the structure and roof system of the building. Scott, with K&A, says that the project is still a couple of weeks behind due to the dirt work and weather. However, Scott is confident that these two weeks will be made up over the course of the project.
Wednesday, March 5, 2008
March 5, 2008
The pictures below are from todays site meeting. the retaining wall has been completely poured. The first pictures shows the wall from the back property line all the way to the corner. The concreted subcontractors are currently adding a finish to all exposed surfaces of the wall in order to fill in the holes and give it an even look.
The next three pictures show the footings and first 2 to 3 rows of block for the building walls. Also, you can see that all the underslab plumbing has been roughed. The electrical contractor is on site at the time of the pictures working on the underslab electrical conduit. Once all the plumbing and electical is done, the slab floor will be poured. This should take place later this week.

The next three pictures show the footings and first 2 to 3 rows of block for the building walls. Also, you can see that all the underslab plumbing has been roughed. The electrical contractor is on site at the time of the pictures working on the underslab electrical conduit. Once all the plumbing and electical is done, the slab floor will be poured. This should take place later this week.
Houndstooth Update